CFP last date
20 January 2025
Reseach Article

An Approach to Risk Analysis for Construction Project using Fuzzy Logic

by Sushanta Kumer Roy, Kalyan Kumar Mallick, Farhana Rashid, Aminur Rahman Khan, Ramani Ranjan Sikder, Md. Tareq Hasan
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 186 - Number 54
Year of Publication: 2024
Authors: Sushanta Kumer Roy, Kalyan Kumar Mallick, Farhana Rashid, Aminur Rahman Khan, Ramani Ranjan Sikder, Md. Tareq Hasan
10.5120/ijca2024924245

Sushanta Kumer Roy, Kalyan Kumar Mallick, Farhana Rashid, Aminur Rahman Khan, Ramani Ranjan Sikder, Md. Tareq Hasan . An Approach to Risk Analysis for Construction Project using Fuzzy Logic. International Journal of Computer Applications. 186, 54 ( Dec 2024), 1-8. DOI=10.5120/ijca2024924245

@article{ 10.5120/ijca2024924245,
author = { Sushanta Kumer Roy, Kalyan Kumar Mallick, Farhana Rashid, Aminur Rahman Khan, Ramani Ranjan Sikder, Md. Tareq Hasan },
title = { An Approach to Risk Analysis for Construction Project using Fuzzy Logic },
journal = { International Journal of Computer Applications },
issue_date = { Dec 2024 },
volume = { 186 },
number = { 54 },
month = { Dec },
year = { 2024 },
issn = { 0975-8887 },
pages = { 1-8 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume186/number54/an-approach-to-risk-analysis-for-construction-project-using-fuzzy-logic/ },
doi = { 10.5120/ijca2024924245 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-12-27T02:45:35.297857+05:30
%A Sushanta Kumer Roy
%A Kalyan Kumar Mallick
%A Farhana Rashid
%A Aminur Rahman Khan
%A Ramani Ranjan Sikder
%A Md. Tareq Hasan
%T An Approach to Risk Analysis for Construction Project using Fuzzy Logic
%J International Journal of Computer Applications
%@ 0975-8887
%V 186
%N 54
%P 1-8
%D 2024
%I Foundation of Computer Science (FCS), NY, USA
Abstract

Project managers play very important role in the execution of the complete project whether it would be the initiation stage, planning stage, execution stage, monitoring and controlling or the closing stages of the project under the restriction of a variety of constraints. Therefore, it is extremely important that these constraints can be controlled and managed simultaneously. Fuzzy analysis approach explains risk reasoning process in the field of risk analysis and management. In this paper we will present an effective technique to model risk analysis with construction project using fuzzy triangular representation and its adaptation on membership function which expresses the project productivity graphically. The model proposed in this paper assesses the related risks with a construction operation based on linguistic approximation of evaluations made by three experts or associated professionals. The outcomes got from this model demonstrate a precise and compelling way for risk investigation of any project related to many activities.

References
  1. Yacov Y. Haimes, “Risk Modeling, Assessment, and Management,” Xi'an Jiao Tong University Press, vol. 2,pp. 77-78, 2007.
  2. Liu Qi, Xiong Jia and Deng Yong, “A subjective methodology for risk quantification based on generalized fuzzy numbers,” International Journal of General Systems, vol. 294, pp. 149-165, Feb 2008.
  3. Schmucker, K.J., “Nature language computation, and risk analysis,” Rockville, MD: Computer Science, 2008.
  4. R. Kangari and L. S. Riggs, “Construction risk assessment by linguistics,” IEEE Trans. Eng. Manag., vol. 36, pp. 126-131, Feb 1989.
  5. Cai, K.Y., “System failure engineering and fuzzy methodology: an introductory overview,” Fuzzy Sets and Systems, vol. 83, pp. 113-133, 1996.
  6. Chen, S.M., “New methods for subjective mental workload assessment and fuzzy risk analysis,” Journal of Cybernetics and Systems, vol. 27, pp. 449-472, 1996.
  7. Chen, S.J. and Chen, S.M., “Fuzzy risk analysis based on similarity measures of generalized fuzzy numbers,” IEEE Transactions and Fuzzy Systems, vol. 11, pp. 45-56, 2008.
  8. Chen, S.H., “Operations on fuzzy number with function principle,” Information Sciences, vol. 6, pp. 13-25, 1985.
  9. Hsieh, C.H., “A model and algorithm of fuzzy product positioning,” Phil. Trans. Roy. Soc. London, vol. 121, pp.61-82, Dec 1999
  10. N.N.A Karim, I.A. Rahman.,” Significant Risk Factors in Construction Projects: Contractor’s Perception”, 2012 IEEE Colloquium on Humanities, Science and Engineering Research (CHUSER 2012), December 3-4, 2012, Kota Kinabalu, Sabah Malaysia
  11. P. S. P. W. and S. O. Cheung, “No Structural Equation Model of Trust and Partnering Success,” Journal of Management in Engineering, Vol. 21, no. 2, pp. 70 – 80, 2005.
  12. I. Enshassi, A., Lisk, R., Sawalhi, I., & Radwan, “Contributors to construction delays in Palestine,” The Journal of American Institute of Constructors, vol. 27(2), pp. 45–53, 2003.
  13. A. D. Ibrahim, A. D. F. Price, A. R. J. Dainty, C. Engineering, A. Road, and E. Adibrahimlboroacuk, “The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria,” vol. 11, no. 3, pp. 149–163, 2006.
  14. J.H.M Tah and V.Carr, (2000), “A proposal for construction project risk assessment using fuzzy logic”, Construction Management and Economics, 18, pp 491500.
  15. A. P. C. Chan, D. W. M. Chan, and J. F. Y. Yeung, “Overview of the application of “fuzzy techniques” in construction management research,” Journal of Construction Engineering & Management, vol. 135, no. 11, pp. 1241–1252, 2009. View at Publisher · View at Google Scholar.
  16. G. Bojadziev and M. Bojadziev, Fuzzy Logic or Business, Finance, and Management, vol. 12 of Advances in Fuzzy Systems: Applications and Theory, World Scientific, Singapore, 1997.
  17. Bennett J.C. , Bohoris G.A., Aspinwall E.M., Hall R.C., (1996), “Risk Analysis techniques and their application to software development”, European journal of operation research, 95, pp 467475.
  18. D.White, (1995), “Application of systems thinking to risk management: a review of the literature”, Management Decision, 3(10), pp 3545.
  19. R.K.J.R. Rainer, C.A. Snyder, H.H. Carr, (1991), “Risk analysis for information technology”, Journal of Management Information Systems, 8(1), pp 129147.
  20. B.W. Boehm, (1989), “Software Risk Management”, IEEE Computer, Society Press, Washington D.C.
  21. E.W.T Ngai, F.K.T Wat, (2005), “Fuzzy decision support system for risk analysis in ecommerce development”, Decision Support Systems, 40, pp 235255.
  22. G.Bojadziev, M.Bojadziev, (1997), “Fuzzy Logic for Business,Financeand Management”, World scientific, Singapore.
  23. Pejman Rezakhani, “Fuzzy Risk Analysis Model for Construction Projects”, INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING, Volume 2, No 2, 2011 .
  24. Pejman Rezakhani , “CLASSIFYING KEY RISK FACTORS IN CONSTRUCTION PROJECTS”, BULETINUL INSTITUTULUI POLITEHNIC DIN IAŞI, 2012.
  25. Y-Y GUH, C-C HON, K-MING WANG and E.S. Lee, “Fuzzy Weighted Average: A Max- Min Paired Elimination Method”, Computers Math. Applic. Vol. 32, No. 8, pp. 115-123, 1996.
  26. Ting-Yu Chen, Tai-Chun Ku, Che-Wei Tsui, “Determining attribute importance based on triangular and trapezoidal fuzzy numbers in (z)fuzzy measures” Project Management Institute (PMI), 2008. A Guide to Project Management body of Knowledge (PMBOK guide). Newton Square, PA: Project Management Institute, Inc.
Index Terms

Computer Science
Information Sciences

Keywords

Fuzzy Risk Fuzzy Membership function Fuzzy Weighted Average (FWA) Linguistic Approximation Natural Language representation