We apologize for a recent technical issue with our email system, which temporarily affected account activations. Accounts have now been activated. Authors may proceed with paper submissions. PhDFocusTM
CFP last date
20 November 2024
Reseach Article

A Reliable Schedule with Budget Constraints in Grid Computing

by I. Stephie Rachel, Joshua Samuel Raj, V. Vasudevan
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 64 - Number 3
Year of Publication: 2013
Authors: I. Stephie Rachel, Joshua Samuel Raj, V. Vasudevan
10.5120/10614-5332

I. Stephie Rachel, Joshua Samuel Raj, V. Vasudevan . A Reliable Schedule with Budget Constraints in Grid Computing. International Journal of Computer Applications. 64, 3 ( February 2013), 23-28. DOI=10.5120/10614-5332

@article{ 10.5120/10614-5332,
author = { I. Stephie Rachel, Joshua Samuel Raj, V. Vasudevan },
title = { A Reliable Schedule with Budget Constraints in Grid Computing },
journal = { International Journal of Computer Applications },
issue_date = { February 2013 },
volume = { 64 },
number = { 3 },
month = { February },
year = { 2013 },
issn = { 0975-8887 },
pages = { 23-28 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume64/number3/10614-5332/ },
doi = { 10.5120/10614-5332 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-06T21:15:26.864837+05:30
%A I. Stephie Rachel
%A Joshua Samuel Raj
%A V. Vasudevan
%T A Reliable Schedule with Budget Constraints in Grid Computing
%J International Journal of Computer Applications
%@ 0975-8887
%V 64
%N 3
%P 23-28
%D 2013
%I Foundation of Computer Science (FCS), NY, USA
Abstract

The application system while executing in a Grid environment may encounter a failure. This phenomenon can be overcome by a reliable scheduler who plays the major role of allocating the applications to the reliable resources based on the reliability requirement of the applications given by the users. The reliability requirement considered in this paper is deadline and budget which is also the quality of service requirement needed for the applications. In this paper, based on deadline and budget as a main factor the tasks are scheduled to the reliable processors.

References
  1. Grimshaw, A. What is a Grid? Grid Today, 1(26), 2002.
  2. Christopher Dabrowski, "Reliability in grid computing System" Concurrency & computation practice & experience, 2009.
  3. A. Dogan, F. Ozguner, Biobjective scheduling algorithms for execution time reliability trade-off in heterogeneous computing systems, Comput. J. 48 (3) (2005) 300–314.
  4. Xiaoyong Tang, Kenli Li, Meikang Qiu, Edwin Hsing-Mean Sha: A hierarchical reliability-driven scheduling algorithm in grid systems. J. Parallel Distrib. Comput. 72(4): 525-535 (2012)
  5. S. Srinivasan and N. K Jha, "Safety and Reliability Driven Tasks Allocation in Distributed Systems",IEEE Trans. Parallel and distributed system, Vol. 10 No3, Mar. 1990.
  6. X. Tang, K. Li, R. Li, B. Veeravalli, "Reliability-aware scheduling strategy for heterogeneous distributed computing systems",J. ParallelDistrib. Comput. 70 (9) (2010) 941–952.
  7. Y. He, Z. Shao, B. Xiao, Q. Zhuge, Edwin Sha, "Reliability driven task scheduling for Heterogeneous systems", in: The International Conference on Parallel and Distributed Computing and Systems, 2003, pp. 465–470.
  8. Wei Luo, Xiao Qin, Kiranmai Bellam, "Reliability-Driven Scheduling of Periodic Tasks in Heterogeneous Real-Time Systems", 21st International Conference on Advanced Information Networking and Applications Workshops, 2007 (1) 778- 783
  9. Xiao qin, hong jiang ,Changsheng xie And Zongfen han , "Reliability-driven scheduling for real-time tasks with precedence constraints in heterogeneous systems", 12 th International Conference Parallel and Distributed Computing and Systems,2000
  10. P. Chitra, P. Venkatesh and R. Rajaram, "Comparison of evolutionary computation algorithms for solving bi-objective task scheduling Problem on heterogeneous distributed computing systems", on Indian Academy of Sciences, 2011 (36) 167-180.
  11. Amir M Bidgoli, Zahra Masoudi Nezad, "A new scheduling algorithm design for grid computing tasks", 5th SASTech 2011, Khavaran Higher- education Institute, Mashhad, Iran. May 12-14.
  12. Xiao Qin and Hong Jiang. A Dynamic and Reliability-driven Scheduling Algorithm for Parallel Real-time Jobs on Heterogeneous Clusters. Journal of Parallel and Distributed Computing (JPDC), Vol. 65, No. 8, pp 885-900, August 2005.
  13. Kovvur Ram Mohan Rao, Ramachandram , Vijaya Kumar Kadappa and Govardhan , "A Reliable Distributed Grid Scheduler for Independent Tasks", IJCSI International Journal of Computer Science Issues, Vol. 8,Issue 2, March 2011.
  14. Muthucumaru Maheswaran, Shoukat Ali and Howard Jay Siegel, Debra Hensgen, Richard F. Freund, "Dynamic Mapping of a Class of Independent Tasks onto Heterogeneous Computing Systems" Journal of Parallel and Distributed Computing 59, 107_131 (1999)
Index Terms

Computer Science
Information Sciences

Keywords

Grid Scheduling Deadline Budget Reliability