CFP last date
20 December 2024
Reseach Article

Integrated Supply Chain Model for Perishable Items with Trade Credit Policy under Imprecise Environment

by Chaman Singh, S. R. Singh
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 48 - Number 20
Year of Publication: 2012
Authors: Chaman Singh, S. R. Singh
10.5120/7468-0592

Chaman Singh, S. R. Singh . Integrated Supply Chain Model for Perishable Items with Trade Credit Policy under Imprecise Environment. International Journal of Computer Applications. 48, 20 ( June 2012), 41-45. DOI=10.5120/7468-0592

@article{ 10.5120/7468-0592,
author = { Chaman Singh, S. R. Singh },
title = { Integrated Supply Chain Model for Perishable Items with Trade Credit Policy under Imprecise Environment },
journal = { International Journal of Computer Applications },
issue_date = { June 2012 },
volume = { 48 },
number = { 20 },
month = { June },
year = { 2012 },
issn = { 0975-8887 },
pages = { 41-45 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume48/number20/7468-0592/ },
doi = { 10.5120/7468-0592 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-06T20:44:38.324382+05:30
%A Chaman Singh
%A S. R. Singh
%T Integrated Supply Chain Model for Perishable Items with Trade Credit Policy under Imprecise Environment
%J International Journal of Computer Applications
%@ 0975-8887
%V 48
%N 20
%P 41-45
%D 2012
%I Foundation of Computer Science (FCS), NY, USA
Abstract

It is the purpose of this paper to investigate the integrated cost minimizing strategy with supplier's trade credits offer under fuzzy environment. Supplier permits the retailer a certain fixed period to settle the amount owed to him for the items supplied. Expressions for average integrated inventory cost in fuzzy sense are derived Signed Distance Method is used to defuzzified total fuzzy cost and its optimization with respect to the decision variable is carried out. A numerical example is cited to illustrate the model. A comparison is made between integrated cost policy and the individual cost polices. It is shown that integrated cost policy results in impressive cost reduction. Computer software Mathematics 7. 0 is used to derive the optimal policies.

References
  1. Aviv, Y. , 2001. 'The effect of collaborative forecasting on supply chain performance', Management Science, Vol. 47, No. 10, pp. 1326–1343.
  2. Chang H. C. , Yao J. S. , Quyang L. Y. , 2004. Fuzzy mixture inventory model with variable lead-time based on probabilistic fuzzy set and triangular fuzzy number. Computer and Mathematical Modeling, 39, 287-304.
  3. Chang, Tao C. , Ouyang, Yuh L. , Teng, Tsair J. , 2003. An EOQ model for deteriorating items under supplier credits linked to ordering quantity. Applied Mathematics Modeling, 27(12), 983-996.
  4. Chen L. H. , Kang F. S. , 2007. Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments. European Journal of Operational Research, 183(2), 933-943.
  5. Goyal S. K. , 1985. Economic order quantity under conditions of permissible delay in payments. The Journal of the Operational Research Society, 36 (4), 335-338.
  6. Hwang H. , Shinn S. W. , 1997. Retailer's pricing and lot sizing policy for exponentially deteriorating product under condition of permissible delay in payments. Computer and Operations Research, 24, 539-547.
  7. Kim S. W. , Park S. , 2008. Development of a three-echelon SC model to optimize coordination costs. European Journal of Operational Research, 184(3), 1044-1061.
  8. Maloni, M. J. , Benton, W. C. , 1997. Supply chain partnership: opportunities for operations research, European Journal of Operational Research, 101, 419–429.
  9. Rau H. , Ouyang B. C. , 2008. An optimal batch size for integrated production-inventory policy in a supply chain. European Journal of Operational Research, 185(2); 619-634.
  10. Singh S. R. , Singh T. J. , Singh C. , 2007. Perishable inventory model with quadratic demand, partial backlogging and permissible delay in payments. International Review of Pure and Applied Mathematics, 3(2), 199-212.
  11. Singh, S. R. and Singh, C. , 2008. Fuzzy inventory model for finite rate of replenishment using signed distance method, International Transactions in Mathematical Sciences and Computer, 1(1), 21-30.
  12. Singh, S. R. , Singh, C. , 2010. Two echelon supply chain model with imperfect production, for Weibull distribution deteriorating items under imprecise and inflationary environment. International Journal of Operations Research and Optimization, 1(1), 9-25.
  13. Singh, S. R. , Singh, C. , 2010. Supply Chain Model with Stochastic Lead Time under Imprecise Partially Backlogging and Fuzzy Ramp-Type Demand for Expiring Items. International Journal of Operational Research, 8(4), 511-522.
  14. Thomas, D. J. , Grif. n, P. M. , 1996. Coordinated supply chain management. European Journal of Operational Research, 94, 1–15.
  15. Wu Z. , Choi T. Y. , 2005. Supplier-supplier relationships in the buyer-supplier triad: Building theories from eight case studies. Journal of Operations Management, 24(5), 27-52.
  16. Yang P. C. , Wee H. M. , 2000. Economic order policy of deteriorated items for vendor and buyer: An integral approach. Production Planning and Control Management, 16(6), 455-463.
  17. Yao J. S. , Lee H. M. , 1999. Fuzzy inventory with or without backorder for fuzzy order quantity with trapezoidal fuzzy number. Fuzzy Sets and Systems, 105, 311-337.
  18. Yao J. S. , Chang S. C. , Su J. S. , 2000. Fuzzy inventory without backorder for fuzzy order quantity and fuzzy total demand quantity. European Journal of Operational Research, 148, 401-409.
Index Terms

Computer Science
Information Sciences

Keywords

Supply Chain Management Permissible Delay Signed Distance Method