CFP last date
20 December 2024
Reseach Article

Cost-Benefit Analysis of a Parallel System with Arrival Time of the Server and Maximum Repair time

by S.c.malik, Gitanjali
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 46 - Number 5
Year of Publication: 2012
Authors: S.c.malik, Gitanjali
10.5120/6907-9303

S.c.malik, Gitanjali . Cost-Benefit Analysis of a Parallel System with Arrival Time of the Server and Maximum Repair time. International Journal of Computer Applications. 46, 5 ( May 2012), 39-44. DOI=10.5120/6907-9303

@article{ 10.5120/6907-9303,
author = { S.c.malik, Gitanjali },
title = { Cost-Benefit Analysis of a Parallel System with Arrival Time of the Server and Maximum Repair time },
journal = { International Journal of Computer Applications },
issue_date = { May 2012 },
volume = { 46 },
number = { 5 },
month = { May },
year = { 2012 },
issn = { 0975-8887 },
pages = { 39-44 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume46/number5/6907-9303/ },
doi = { 10.5120/6907-9303 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-06T20:39:00.409240+05:30
%A S.c.malik
%A Gitanjali
%T Cost-Benefit Analysis of a Parallel System with Arrival Time of the Server and Maximum Repair time
%J International Journal of Computer Applications
%@ 0975-8887
%V 46
%N 5
%P 39-44
%D 2012
%I Foundation of Computer Science (FCS), NY, USA
Abstract

An attempt has been made to develop a cost-benefit analysis for a system of two identical units with parallel redundancy. Each unit has direct complete failure from normal operative mode. The system is considered in up-state if at least one unit is operative. There is a single server who takes some time to arrive at the system for doing repair activities. If server unable to repair the failed unit in a pre specific time (called maximum repair time), the unit is replaced by new one with some replacement time. The failure time of the unit and maximum repair time taken by the server are exponentially distributed while the distributions of arrival time of the server, repair and replacement of the unit are taken as arbitrary with different probability density functions. The expressions for various parameters of vital significance have been derived using semi-Markov process and regenerative point technique. The graphical study of the results obtained for a particular case has also been made

References
  1. T. Nakagawa and S. Osaki (1975): Stochastic Behavior of Two-Unit Parallel Redundant System With Repair Maintenance. Microelectronics and Reliability, Vol. 14(6), pp. 457-461.
  2. Singh, S. K. and Agrafiotis, G. K. (1995): Stochastic Analysis of a Two-Unit Cold Standby System Subject to Maximum Operation and Repair Time. Microelectron. Reliab. Vol. 35 (12), pp. 1489 –1493.
  3. Chander, S. (2005): Reliability models with priority for operation and repair with arrival time of server. Journal of Pure and Applied Mathematika Sciences, Vol. LXI(1-2), pp. 9-22.
  4. Kumar,Jitender, Kadyan M. S. and Malik, S. C. ( 2010): Cost-Benefit Analysis of a Two-Unit Parallel System Subject to Degradation After Repair. Applied Mathematical Sciences, Vol. 4, No. 5, pp. 2749-2758
Index Terms

Computer Science
Information Sciences

Keywords

Reliability Parallel-unit System Replacement Maximum Repair Time And Cost-benefit Analysis