We apologize for a recent technical issue with our email system, which temporarily affected account activations. Accounts have now been activated. Authors may proceed with paper submissions. PhDFocusTM
CFP last date
20 December 2024
Reseach Article

Probabilistic Analysis of a Computer System with Inspection and Priority for Repair Activities of H/W over Replacement of S/W

by Jyoti Anand, S. C. Malik
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 44 - Number 1
Year of Publication: 2012
Authors: Jyoti Anand, S. C. Malik
10.5120/6227-8282

Jyoti Anand, S. C. Malik . Probabilistic Analysis of a Computer System with Inspection and Priority for Repair Activities of H/W over Replacement of S/W. International Journal of Computer Applications. 44, 1 ( April 2012), 16-19. DOI=10.5120/6227-8282

@article{ 10.5120/6227-8282,
author = { Jyoti Anand, S. C. Malik },
title = { Probabilistic Analysis of a Computer System with Inspection and Priority for Repair Activities of H/W over Replacement of S/W },
journal = { International Journal of Computer Applications },
issue_date = { April 2012 },
volume = { 44 },
number = { 1 },
month = { April },
year = { 2012 },
issn = { 0975-8887 },
pages = { 16-19 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume44/number1/6227-8282/ },
doi = { 10.5120/6227-8282 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-06T20:36:25.801505+05:30
%A Jyoti Anand
%A S. C. Malik
%T Probabilistic Analysis of a Computer System with Inspection and Priority for Repair Activities of H/W over Replacement of S/W
%J International Journal of Computer Applications
%@ 0975-8887
%V 44
%N 1
%P 16-19
%D 2012
%I Foundation of Computer Science (FCS), NY, USA
Abstract

The main aim of this paper is to carry out the probabilistic analysis of a computer system of two identical units in which one is operative and the other is in cold standby. In each unit h/w and s/w components fail independently and work together. A server visits the system immediately to inspect the h/w components at their failure to see the feasibility of repair. If repair of the h/w is not feasible, it is replaced by new one in the unit. However, only replacement of the s/w components is made by new one at their failure. Priority to the replacement and repair of the h/w components is given over the replacement of the s/w components. All the failure time distributions are assumed to be negative exponential while that of inspection, repair and replacement times are taken as arbitrary. Some reliability and economic measures of system effectiveness are evaluated using semi-Markov process and regenerative point technique. The graphs are drawn for a particular case to show the behavior of MTSF, availability and profit of the system models.

References
  1. Friedman, M. A. and Tran, P. 1992: Reliability Techniques for Combined Hardware / Software Systems. Proceedings of Annual Reliability and Maintainability Symposium, pp. 209-293.
  2. Welke, S. R. ; Johnson, B. W. and Aylar, J. H. 1995: Reliability Modeling of Hardware Software Systems. IEEE Transactions on Reliability, Vol. 44(3), pp. 413-418
  3. Malik, S. C. and Anand, Jyoti 2010: Reliability And Economic Analysis of a Computer System With Independent H/W and S/W Failures. Bulletin of Pure and Applied Sciences (BPASS), Vol. 29E(No. 1),pp. 141-153
  4. Malik, S. C. and Anand, Jyoti 2011: Reliability Modeling of a Computer System With Priority for Replacement at Software Failure over Repair Activities at H/W Failure. International Journal of Statistics and System (IJSS), ISSN 0973-2675, Vol. 6(3),pp. 315-325.
  5. Malik, S. C. and Ashish Kumar 2011. Profit Analysis of a Computer System with Priority to Software Replacement over Hardware Repair Subject to Maximum Operation and Repair Times, International Journal of Engineering Science & Technology, Vol. 3, No. 10, pp. 7452- 7468.
  6. Lai, C. D. ; Xie, M. ; Poh, K. L. ; Dai, Y. S. and Yang, P. 2002: A model for availability analysis of distributed software / hardware systems, Information and Software Technology, Vol. 44, pp. 343-350.
  7. Malik, S. C. 2008: Reliability modeling and profit analysis of a single-unit system with inspection by a server who appears and disappears randomly, Journal of Pure and Applied Mathematika Sciences, Vol. LXVII (1-2), pp. 135-146.
Index Terms

Computer Science
Information Sciences

Keywords

Computer System Hardware And Software Failures Feasibility Of Repair Priority For Replacement Repair And Inspection Probabilistic Analysis