Notification: Our email services are now fully restored after a brief, temporary outage caused by a denial-of-service (DoS) attack. If you sent an email on Dec 6 and haven't received a response, please resend your email.
CFP last date
20 December 2024
Reseach Article

Stochastic Analysis of Markov Chain Model with different Types of Repair Facility

by Manoj Kumar, Shiv Kumar
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 184 - Number 25
Year of Publication: 2022
Authors: Manoj Kumar, Shiv Kumar
10.5120/ijca2022922306

Manoj Kumar, Shiv Kumar . Stochastic Analysis of Markov Chain Model with different Types of Repair Facility. International Journal of Computer Applications. 184, 25 ( Aug 2022), 34-40. DOI=10.5120/ijca2022922306

@article{ 10.5120/ijca2022922306,
author = { Manoj Kumar, Shiv Kumar },
title = { Stochastic Analysis of Markov Chain Model with different Types of Repair Facility },
journal = { International Journal of Computer Applications },
issue_date = { Aug 2022 },
volume = { 184 },
number = { 25 },
month = { Aug },
year = { 2022 },
issn = { 0975-8887 },
pages = { 34-40 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume184/number25/32470-2022922306/ },
doi = { 10.5120/ijca2022922306 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-07T01:22:23.946915+05:30
%A Manoj Kumar
%A Shiv Kumar
%T Stochastic Analysis of Markov Chain Model with different Types of Repair Facility
%J International Journal of Computer Applications
%@ 0975-8887
%V 184
%N 25
%P 34-40
%D 2022
%I Foundation of Computer Science (FCS), NY, USA
Abstract

The paper deals with cost-benefit and reliability analysis of two non-identical units considering all random variables are statistically independent, by using regenerative point technique. Initially, one unit is operative and other unit is warm standby, a single repair facility is always available with the system to perform all repair activities. The failure time distribution of both units taken as an exponential distribution with different parameters whereas all repair time distributions are taken as general. Various important characteristics of reliability like steady-state availability, mean sojourn time, mean time to system failure (MTSF), busy period and cost-benefit of the system have been studied.

References
  1. El-Said, K.M., Cost analysis of a system with preventive maintenance by using Kolmogorov’s forward equations method, Ame. J. of App. Sci., 5(4) 405-410 (2008).
  2. Haggag, M.Y., Cost analysis of a system involving common cause failures and preventive maintenance, J. Maths. And Stat., 5(4) 305-310 (2009).
  3. Mahmoud, M.A.W. and Moshref, M.E., On a two unit cold standby system considering hardware, human error failures and preventive maintenance, Mathematics and Computer modeling, 51(5-6), 736-745 (2010).
  4. Kumar, Jitender.,Kadyan, M.S. and Malik, S.C., Cost benefit analysis of a two unit parallel system subject to degradation after repair, Applied mathematical sciences, 4(56) 2749-2758 (2010).
  5. Malik S. C., Reliability models with priority for operation and repair with arrival time of server. Journal of Pure and Applied Mathematika Sciences, LXI (1-2) 9-22 (2005).
  6. Kumar, J. and Kadyan, M.S., Profit analysis of a system of non identical units with degradation and replacement. International journal of computer application, 40 (3) 19-25 (2012).
  7. Bhardwaj R. K., Kaur K., Malik S. C., Stochastic Modeling of a System with Maintenance and Replacement of Standby Subject to Inspection, American Journal of Theoretical and Applied Statistics, 4(5) 339-346 (2015).
  8. Mahmoud M. A. W. and Moshref M. E., On a two unit cold standby system considering hardware, human error failures and preventive maintenance, Mathematics and Computer modeling, 51(5-6) 736-745 (2010).
  9. G.R. Mohtashami Borzadaran, and M. Asadi, Reliability Modeling of Two-unit Cold Standby Systems: A Periodic Switching Approach, Z. Behboudi, Applied Mathematical Modelling, 92 176-195 (2021).
  10. Khalaf S. Sultan and Mohamed E. Moshref, Stochastic Analysis of a Priority Standby System under Preventive Maintenance, Applied Sciences, 11 3861-3872 (2021).
  11. P. S. Pundir, R. Patawa and P. K. Gupta, Analysis of Two Non-Identical Unit Cold Standby System in Presence of Prior Information, American Journal of Mathematical and Management Sciences, 40-3 188-200 (2021).
Index Terms

Computer Science
Information Sciences

Keywords

Two non-identical units Transition probability Mean sojourn time MTSF Availability Busy period and Cost-benefit analysis