Judgment of Temporary over Voltages during Transformer Refurbishment

by V V Rajagopal Peesapati, Niranjan Kumar, Vinod Kumar Yadav
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 108 - Number 2
Year of Publication: 2014
Authors: V V Rajagopal Peesapati, Niranjan Kumar, Vinod Kumar Yadav
10.5120/18887-0170

V V Rajagopal Peesapati, Niranjan Kumar, Vinod Kumar Yadav . Judgment of Temporary over Voltages during Transformer Refurbishment. International Journal of Computer Applications. 108, 2 ( December 2014), 39-42. DOI=10.5120/18887-0170

@article{ 10.5120/18887-0170,
author = { V V Rajagopal Peesapati, Niranjan Kumar, Vinod Kumar Yadav },
title = { Judgment of Temporary over Voltages during Transformer Refurbishment },
journal = { International Journal of Computer Applications },
issue_date = { December 2014 },
volume = { 108 },
number = { 2 },
month = { December },
year = { 2014 },
issn = { 0975-8887 },
pages = { 39-42 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume108/number2/18887-0170/ },
doi = { 10.5120/18887-0170 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-06T22:41:59.819821+05:30
%A V V Rajagopal Peesapati
%A Niranjan Kumar
%A Vinod Kumar Yadav
%T Judgment of Temporary over Voltages during Transformer Refurbishment
%J International Journal of Computer Applications
%@ 0975-8887
%V 108
%N 2
%P 39-42
%D 2014
%I Foundation of Computer Science (FCS), NY, USA
Abstract

In this research work Radial Basis Function (RBF) Neural Network (NN) and Regression models are used to estimate Temporary over Voltages (TOVs) that are occurred during the reenergization of lightly loaded transformer. Assessment of the TOVs are carried out in order to control the high peak voltage up to a safe operating point to ensure the safety of the power system equipments. The proposed approaches are applied to the standard IEEE 30 bus test system to evaluate its efficacy. The statistical approach is applied to examine the robustness of the forecasting results. Results show that the methods conveyed in this research are better and could be helpful for power system restoration planning.

References
  1. Saber Nouri-Zadeh and Ali Mohammad Ranjbar, "Multi objective power system restoration," in Proc. 2008 IEEE Power and Energy Conf. , pp. 1-5.
  2. V. Yari, S. Nourizadeh and A. M. Ranjbar, "Determining the Best Sequence of Load Pickup During Power System Restoration," in Proc. 2010 9th Int. Conf. Environmental and Electrical Engineering, pp. 1-4.
  3. Saber Nourizadeh, Vahid Yari and Ali Mohammad Ranjbar, "Frequency Monitoring and Control during Power System Restoration Based on Wide Area Measurement System," Mathematical Problems in Engineering, vol. 2011. pp. 1-13, Jan. 2011.
  4. Jhon H. Brunke and Klaus J. Frohlich, "Elimination of Transformer Inrush Currents by Controlled Switching—Part II: Application and Performance Considerations," IEEE Trans. Power Delivery, vol. 16. pp. 281-285. Apr. 2001.
  5. En Lu, Zhijun Qin, Mingbo Liu, Yunhe Hou, Ning Wang and Jinyu Wen, "Increasing Black Start Capacity by Fast Cut Back Function of Thermal Power Plants," Int. Jour. Smart Grid and Clean Energy, vol. 2. pp. 60-66. Jan. 2013.
  6. LiBao Shi, H. L. Ding, and Zaho Xu, "Determination of Weight Coefficient for Power System Restoration," IEEE Trans. Power Syst. , vol. 27, no. 2, pp. 1140-1141, May 2012.
  7. Yadav VK, Padhy NP and Gupta HO, "Performance evaluation and improvement directions for an Indian electric utility," Energy Policy, vol. 39, pp. 193-205, 2011.
  8. Vinod Kumar Yadav, Yogesh K. Chauhan, N. P. Padhy and H. O. Gupta, "A novel power sector restructuring model based on Data Envelopment Analysis (DEA)," Elect. Power and Energy Syst. vol 44, pp. 629-637, 2013.
  9. S. Lam-Du, T. Tran-Quoc, N. Nguyen-Khac, R. Feuillet, J. C. Sabonnadiere, K. Nguyen-Boi, Q. Nguyen, "Temporary Over Voltages in The Vietnam 500kV Network," in Proc. 1998 Int. Conf. Energy Management and Power Delivery. pp. 275-280.
  10. C. E. Lin, C. L. Cheng, C. L. Huang, and J. C. Yeh, "Investigation of magnetizing inrush current in transformers Part II – Harmonic Analysis," IEEE Trans. Power Delivery, vol. 8, pp. 255-263, Jan. 1993.
  11. N. Rajakovic, and A. Semlyen, "Investigation of the inrush phenomenon a quasi-stationary approach in the harmonic domain," IEEE Trans. Power Delivery, vol. 4, pp. 2114-2120, Oct. 1989.
  12. J. F. Fuller, E. F. Fuchs, and K. J. Roesler, "Influence of harmonics on power distribution system protection," IEEE Trans. Power Delivery, vol. 3, pp. 549-557, Apr. 1988.
  13. G. Sybille, P. Brunelle, L. Hoang, L. A. Dessaint, and K. Al-Haddad, "Theory and applications of power system blockset, a MATLAB/Simulink-based simulation tool for power systems," in Proc. 2000 IEEE Power Eng. Soc. Winter Meeting, pp. 774–779.
  14. Arturo S. Bretas and Arun G. Phadke, "Artificial Neural Networks in Power System Restoration," IEEE Trans. Power Delivery, vol. 18. pp. 1181-1186, Oct. 2003.
  15. Abbas Ketabi, Ali Mohammad Ranjbar and René Feuillet, "Analysis and Control of Temporary Overvoltages for Automated Restoration Planning," IEEE Trans. Power Delivery, vol. 17. pp. 1121-1127. Oct2002.
  16. Iman Sadeghkhani, Abbas Ketabi and Rene Feuillet, "New Approach to Harmonic Overvoltages Reduction during Transformer Energization via Controlled Switching," in Proc. 2009 15th Int. Conf. Intelligent System Applications to Power Systems. pp. 1-6.
  17. Emil Cazacu, Valentin Ionita and Lucian Petrescu, "An Improved Method for the Inrush Current Evaluation in Single Phase Power Transformers," in Proc. 2013 8th Int. Symposium on Advanced Topics in Electrical Engineering, pp. 1-6.
  18. S. A. Kalogirou, "Artificial neural networks in renewable energy systems applications: a review". Renewable and Sustainable Energy Reviews, vol. 5, pp. 373-401, 2000.
Index Terms

Computer Science
Information Sciences

Keywords

Power System Restoration Temporary Over Voltages Radial Basis Function Neural Networks.