CFP last date
20 December 2024
Reseach Article

Reliability Measures of a Two-Unit Cold Standby Repairable System with Priority to Operation over Preventive Maintenance

by Sonali Baweja, Ashish Kumar
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 104 - Number 1
Year of Publication: 2014
Authors: Sonali Baweja, Ashish Kumar
10.5120/18164-9024

Sonali Baweja, Ashish Kumar . Reliability Measures of a Two-Unit Cold Standby Repairable System with Priority to Operation over Preventive Maintenance. International Journal of Computer Applications. 104, 1 ( October 2014), 5-9. DOI=10.5120/18164-9024

@article{ 10.5120/18164-9024,
author = { Sonali Baweja, Ashish Kumar },
title = { Reliability Measures of a Two-Unit Cold Standby Repairable System with Priority to Operation over Preventive Maintenance },
journal = { International Journal of Computer Applications },
issue_date = { October 2014 },
volume = { 104 },
number = { 1 },
month = { October },
year = { 2014 },
issn = { 0975-8887 },
pages = { 5-9 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume104/number1/18164-9024/ },
doi = { 10.5120/18164-9024 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-06T22:35:00.217111+05:30
%A Sonali Baweja
%A Ashish Kumar
%T Reliability Measures of a Two-Unit Cold Standby Repairable System with Priority to Operation over Preventive Maintenance
%J International Journal of Computer Applications
%@ 0975-8887
%V 104
%N 1
%P 5-9
%D 2014
%I Foundation of Computer Science (FCS), NY, USA
Abstract

The main objective of present work is to carry out various important reliability measures of a two-unit cold standby repairable system with priority to operation over preventive maintenance by using regenerative points technique and semi-Markov process. A single repair facility is provided to conduct repair and maintenance of the system as and when required. All times distributions are exponential except the repair and preventive maintenance time distributions which are considered as general.

References
  1. Gopalan, M. N. & Nagarwall, H. E. : Cost-Benefit analysis of a one server two-unit cold standby system with repair and preventive maintenance, Microelectron Reliability, 25, 267-269, 1985.
  2. Gopalan, M. N. & Bhanu, K. S. : Cost analysis of a two-unit repairable system subject to online preventive maintenance and/ or repair, Microelectron Reliab. , 35(2), 251-258, 1995.
  3. Malik, S. C. : Reliability models with priority for operation and repair with arrival time of server. Journal of Pure and Applied Mathematika Sciences, Vol. LXI (1-2), pp. 9-22, 2005.
  4. Malik, S. C. , Nandal,P. & Bhardwaj, R. K. : Economic analysis of repairable systems with random appearance and disappearance of the service facility. Journal of Mathematics and System Sciences, Vol. 3(1), pp. 36-49, 2007.
  5. Malik, S. C. and Kumar, A. : Reliability modeling of a computer system with priority to s/w replacement over h/w replacement subject to MOT and MRT, International Journal of Pure and Applied Mathematics, Vol. 3, No. 9 (2012), pp. 7191-7204.
Index Terms

Computer Science
Information Sciences

Keywords

Cold Standby System Preventive Maintenance Priority and Profit Function